Wednesday, September 30, 2009

The Build-Part3-Inside Paneling and Cabinets

  June 2009. When we came back from the wedding we discovered that NOTHING had been done on the motorhome for the entire five weeks while we had been gone! We were pretty angry and insisted that they get back to work on it.

Over 9 months since we signed the contract. Kevin installing wiring.
002 (2)
Starting on the inside components. Ken and Tony discussing placement.
002 (5)

Kevin painting. We debated about the inside walls too. We wanted to get the same type of wall material that is normally used in motorhomes- a thin lauan with a tough vinyl wallpaper type skin but it's an item that each manufacturer orders in special lots and we couldn't find any one that sold small lots of it to individuals. We decided to use white ceiling paneling and paint it.
006 (4)
   Shower - we used the outside skin sheeting for the shower walls. It's very durable and scrubbing doesn't damage it.
064
   They started building the cabinet frames and fitting them in place.
059
Kitchen
061
We found a nice little handmade copper sink for the bathroom.
063
   After fitting all the cabinet frames came back out to be finished.